J
Jagadish Nathan
β Verified
18 Sep 2026 β’ Less than 1 month β’ π Coimbatore
β
β
β
β
β
Clamp Band, Large
βΉ 3,067
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Pharmaceutical & Cosmetics
βοΈ Pure water loop
π Coimbatore
Quality 4/5
Delivery 4/5
V
Vidyasagar A
β Verified
18 Sep 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
VALVE ASSEMBLY, FLAP, NE
βΉ 596
View β
Delayed Delivery
Package arrived much later than promised.
π Paint, Ink, and Coatings
βοΈ Screen printing ink
π Chennai
Quality 4/5
Delivery 4/5
A
Ayush Singh
β Verified
18 Sep 2026 β’ Over 1 year β’ π Allahabad
β
β
β
β
β
STUD, 3/8-16 X 1 1/4-
βΉ 340
View β
Broken Links On Site
Several search features did not load properly.
π Mining and Construction
βοΈ Grout injection
π Allahabad
Quality 4/5
Delivery 4/5
D
Dilip Patel
β Verified
18 Sep 2026 β’ Over 1 year β’ π Indore
β
β
β
β
β
DIAPHRAGM, PRI FULL FLOW BOLT
βΉ 4,130
View β
Confusing Interface
Website was difficult to navigate and use.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Indore
Quality 4/5
Delivery 4/5
A
Amit Chatterjee
β Verified
18 Sep 2026 β’ Less than 1 month β’ π Ahmedabad
β
β
β
β
β
DIAPHRAGM, BU, FSS, FULL FLOW
βΉ 684
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Water and Wastewater Treatment
βοΈ Digester cleaning
π Ahmedabad
Quality 4/5
Delivery 4/5
R
Rajesh Banerjee
β Verified
18 Sep 2026 β’ 6β12 months β’ π Lucknow
β
β
β
β
β
Piston, Outer
βΉ 207
View β
Delayed Delivery
Package arrived much later than promised.
π Food and Beverage
βοΈ CIP solution circulation
π Lucknow
Quality 4/5
Delivery 4/5
V
Vijay Garg
β Verified
18 Sep 2026 β’ 1β6 months β’ π Visakhapatnam
β
β
β
β
β
GASKET, MUFFLER PLATE, PX1
βΉ 837
View β
Poor Quality Control
The item felt cheap and fell short.
π Chemical Processing
βοΈ Reactor batching
π Visakhapatnam
Quality 4/5
Delivery 4/5
R
Ramesh Patel
β Verified
18 Sep 2026 β’ 1β6 months β’ π Hyderabad
β
β
β
β
β
Center Section Assembly, Pro-Flo X
βΉ 26,575
View β
Damaged Packaging
Box was torn up and items were loose.
π Pharmaceutical & Cosmetics
βοΈ Chromatography column feeding
π Hyderabad
Quality 4/5
Delivery 4/5
V
Vihaan Tiwar
β Verified
18 Sep 2026 β’ 1β6 months β’ π Mumbai
β
β
β
β
β
Bolt, Rhsn, 1/4-20 X 7 1/2
βΉ 308
View β
Unhelpful Support
Took days to get a generic email reply.
π Mining and Construction
βοΈ Underground utility clearing
π Mumbai
Quality 4/5
Delivery 4/5
A
Aditya Kulkarni
β Verified
18 Sep 2026 β’ 6β12 months β’ π Hyderabad
β
β
β
β
β
O-RING, (.987 X.103)SANIFLEX
βΉ 141
View β
Defective Out of Box
Item failed to work on the first try.
π Food and Beverage
βοΈ Honey dispensing
π Hyderabad
Quality 4/5
Delivery 4/5