V
Vedachalam X
β Verified
28 Jun 2026 β’ 6β12 months β’ π Coimbatore
β
β
β
β
β
DIAPHRAGM (1B-001)
βΉ 15,029
View β
Unhelpful Response
The technical team failed to address our direct issue.
π Paint, Ink, and Coatings
βοΈ Primer coat feeding
π Coimbatore
Quality 4/5
Delivery 4/5
R
Riya Das
β Verified
27 Jun 2026 β’ 1β6 months β’ π Hyderabad
β
β
β
β
β
O-RING
View β
Unhelpful Response
The technical team failed to address our direct issue.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Hyderabad
Quality 4/5
Delivery 4/5
S
Sai Verma
β Verified
27 Jun 2026 β’ 6β12 months β’ π Bhopal
β
β
β
β
β
SUBMERSIBLE SEWAGE PUMP WITH 5 HP MOTOR & 5 HP DOL DIGITAL STARTER (CFSW 534)
βΉ 70,973
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Mining and Construction
βοΈ Filter cake washing
π Bhopal
Quality 4/5
Delivery 4/5
S
Sanjay Mehta
β Verified
27 Jun 2026 β’ Less than 1 month β’ π Surat
β
β
β
β
β
AIR END KIT (B476.227.000)
βΉ 42,180
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Tank circulation
π Surat
Quality 4/5
Delivery 4/5
S
Santosh Reddy
β Verified
27 Jun 2026 β’ Over 1 year β’ π Bengaluru
β
β
β
β
β
AIR END KIT
βΉ 13,656
View β
Inconsistent Output
Performance varies wildly and lacks precision controls.
π Mining and Construction
βοΈ Roadway runoff dewatering
π Bengaluru
Quality 4/5
Delivery 4/5
S
Shikhar Ghosh
β Verified
27 Jun 2026 β’ 1β6 months β’ π Ahmedabad
β
β
β
β
β
SLIDE VALVE-PILOT
View β
Defective Design
Failed under standard load conditions within days.
π Mining and Construction
βοΈ Crushed ore slurry
π Ahmedabad
Quality 4/5
Delivery 4/5
A
Anil Agarwal
β Verified
27 Jun 2026 β’ Over 1 year β’ π Delhi
β
β
β
β
β
SUCTION MANIFOLD-EXB
βΉ 18,086
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Pharmaceutical & Cosmetics
βοΈ Lotion emulsion blending
π Delhi
Quality 4/5
Delivery 4/5
V
Vimal Roy
β Verified
27 Jun 2026 β’ 1β6 months β’ π Meerut
β
β
β
β
β
UPPER PLUG O-RING FFKM (2 50 78 04)
βΉ 7,260
View β
Damaged Arrival
Packaging arrived crushed and internal contents were compromised.
π Chemical Processing
βοΈ Filter press feeding
π Meerut
Quality 4/5
Delivery 4/5
S
Siddharth H
β Verified
27 Jun 2026 β’ Less than 1 month β’ π Coimbatore
β
β
β
β
β
DOUBLE NIPPLE PARALLEL A1 1/8 - 1/8
View β
Unexpected Charges
Additional hidden fees were tacked onto the final bill.
π Food and Beverage
βοΈ Yeast pitching
π Coimbatore
Quality 4/5
Delivery 4/5
V
Vinay Gupta
β Verified
27 Jun 2026 β’ 6β12 months β’ π Uttar Pradesh
β
β
β
β
β
VALL BALL-VITON (1B-055)
View β
Unresponsive Support
Left on hold without receiving any clear resolution.
π Chemical Processing
βοΈ Tank circulation
π Uttar Pradesh
Quality 4/5
Delivery 4/5