G
Gaurav Kumar
β Verified
04 Jul 2026 β’ 1β6 months β’ π Thane
β
β
β
β
β
O-RING, (.299 X.103)POLYURETHA
βΉ 1,221
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Clarifier scum removal
π Thane
Quality 4/5
Delivery 4/5
A
Aarav Bansal
β Verified
04 Jul 2026 β’ Over 1 year β’ π Chennai
β
β
β
β
β
Nut, Hex, 1/2-13
βΉ 21
View β
Poor Quality Control
The item felt cheap and fell short.
π Pharmaceutical & Cosmetics
βοΈ Toothpaste compounding
π Chennai
Quality 4/5
Delivery 4/5
S
Suresh Singh
β Verified
04 Jul 2026 β’ 6β12 months β’ π Visakhapatnam
β
β
β
β
β
Gasket, Air Valve, T15, Turbo
βΉ 107
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Biotech waste inactivation
π Visakhapatnam
Quality 4/5
Delivery 4/5
J
Jignesh Dubey
β Verified
04 Jul 2026 β’ Over 1 year β’ π Delhi
β
β
β
β
β
Gasket, Center Blk, T8, Turbo
βΉ 117
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Chemical Processing
βοΈ Tanker offloading
π Delhi
Quality 4/5
Delivery 4/5
R
Raj Deshmukh
β Verified
04 Jul 2026 β’ Over 1 year β’ π Guwahati
β
β
β
β
β
Piston, Outer, (Ptfe)
βΉ 7,798
View β
Damaged Packaging
Box was torn up and items were loose.
π Chemical Processing
βοΈ Reagent dispensing
π Guwahati
Quality 4/5
Delivery 4/5
P
Pooja Patel
β Verified
04 Jul 2026 β’ 1β6 months β’ π Vadodara
β
β
β
β
β
KIT, CLAMP BAND, SM, W/WING NT
βΉ 2,094
View β
Broken Links On Site
Several search features did not load properly.
π Paint, Ink, and Coatings
βοΈ Drum tinting supply
π Vadodara
Quality 4/5
Delivery 4/5
A
Akash Rathod
β Verified
04 Jul 2026 β’ 1β6 months β’ π Aurangabad
β
β
β
β
β
GASKET, SEAT (NEOPRENE)
βΉ 152
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Water and Wastewater Treatment
βοΈ Stormwater overflow bypass
π Aurangabad
Quality 4/5
Delivery 4/5
R
Rohan Deshmukh
β Verified
04 Jul 2026 β’ 1β6 months β’ π Visakhapatnam
β
β
β
β
β
SCREW, HHC, 5/16-18 X 1 3/8
βΉ 51
View β
Delayed Delivery
Package arrived much later than promised.
π Paint, Ink, and Coatings
βοΈ Can coating circulation
π Visakhapatnam
Quality 4/5
Delivery 4/5
A
Aarav Srivastava
β Verified
04 Jul 2026 β’ Less than 1 month β’ π Pimpri-Chinchwad
β
β
β
β
β
Ball, Valve, Teflon
βΉ 6,622
View β
Confusing Interface
Website was difficult to navigate and use.
π Paint, Ink, and Coatings
βοΈ Pigment mill feeding
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
P
Prakash Prakash
β Verified
04 Jul 2026 β’ 1β6 months β’ π Ranipet
β
β
β
β
β
Muffler, 3/4"
βΉ 2,426
View β
Broken Links On Site
Several search features did not load properly.
π Chemical Processing
βοΈ Surfactant blending
π Ranipet
Quality 4/5
Delivery 4/5