S
Surendra Joshi
β Verified
20 Jul 2026 β’ 6β12 months β’ π Nashik
β
β
β
β
β
GPI HAND PUMP-100 UL (114000-10)
βΉ 16,500
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Oil and Gas
βοΈ Hydraulic Fluid Fill Stations
π Nashik
Quality 4/5
Delivery 4/5
P
Prakash Iyer
β Verified
20 Jul 2026 β’ Less than 1 month β’ π Vijayawada
β
β
β
β
β
BUMP STOP (1B-015)
βΉ 4,485
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Water and Wastewater Treatment
βοΈ Dechlorination agent feed
π Vijayawada
Quality 4/5
Delivery 4/5
A
Anurag Roy
β Verified
20 Jul 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
AIR VALVE ASSEMBLY (031.140.000)
View β
Overpriced Service
The cost is far too premium compared to alternatives.
π Mining and Construction
βοΈ Mine shaft dewatering
π Nagpur
Quality 4/5
Delivery 4/5
V
Varun Agarwal
β Verified
16 Jul 2026 β’ 6β12 months β’ π Chennai
β
β
β
β
β
O-RING BUNA N-EXB
βΉ 427
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Neutralization feeding
π Chennai
Quality 4/5
Delivery 4/5
A
Arjun Malhotra
β Verified
16 Jul 2026 β’ Over 1 year β’ π Pimpri-Chinchwad
β
β
β
β
β
O-RING PTFE - EXB
βΉ 2,223
View β
Disappointed. Inaccurate Fitment
Fit guide wrong.
π Pharmaceutical & Cosmetics
βοΈ Toothpaste compounding
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
A
Abhishek Mehta
β Verified
16 Jul 2026 β’ 6β12 months β’ π Bhopal
β
β
β
β
β
O-RING
View β
Defective Design
Failed under standard load conditions within days.
π Paint, Ink, and Coatings
βοΈ Varnish transfer
π Bhopal
Quality 4/5
Delivery 4/5
V
Vihaan Banerjee
β Verified
16 Jul 2026 β’ Over 1 year β’ π Hyderabad
β
β
β
β
β
BACK PLATE (B612.192.010)
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Food and Beverage
βοΈ Pet food injection
π Hyderabad
Quality 4/5
Delivery 4/5
A
Arun Trivedi
β Verified
16 Jul 2026 β’ Less than 1 month β’ π Visakhapatnam
β
β
β
β
β
VALVE ASSEMBLY (B031.183.000)
βΉ 47,592
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Pharmaceutical & Cosmetics
βοΈ Lotion emulsion blending
π Visakhapatnam
Quality 4/5
Delivery 4/5
A
Ananya Sen
β Verified
16 Jul 2026 β’ 1β6 months β’ π Jaipur
β
β
β
β
β
VALVE SEAT TEFLON 2" (50-048)
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Descaling line supply
π Jaipur
Quality 4/5
Delivery 4/5
A
Anil Joshi
β Verified
16 Jul 2026 β’ Over 1 year β’ π Jaipur
β
β
β
β
β
O'RING - BUNA (560.020.360)
βΉ 192
View β
Frequent Errors
The online portal lags significantly during processing.
π Pharmaceutical & Cosmetics
βοΈ Nail polish filling
π Jaipur
Quality 4/5
Delivery 4/5