R
Rohan Jadav
β Verified
27 Aug 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
DIAPHRAGM TEFLON (1 1550 05)
βΉ 9,471
View β
Defective Design
Failed under standard load conditions within days.
π Pharmaceutical & Cosmetics
βοΈ Vaccine adjuvant addition
π Delhi
Quality 4/5
Delivery 4/5
T
Tarun Mehta
β Verified
27 Aug 2026 β’ Less than 1 month β’ π Amritsar
β
β
β
β
β
BUMPER 3" (132.029.357)
βΉ 1,022
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Food and Beverage
βοΈ Flavoring oil dosing
π Amritsar
Quality 4/5
Delivery 4/5
S
Shubh Arora
β Verified
27 Aug 2026 β’ Less than 1 month β’ π Vadodara
β
β
β
β
β
VALVE SEAR SS EXI (1B-051)
βΉ 3,324
View β
Defective Design
Failed under standard load conditions within days.
π Mining and Construction
βοΈ Tailings slurry transfer
π Vadodara
Quality 4/5
Delivery 4/5
V
Vaibhav Gaikwad
β Verified
27 Aug 2026 β’ 1β6 months β’ π Ahmedabad
β
β
β
β
β
VALVE BALL EPDM
βΉ 4,477
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Chemical Processing
βοΈ Scrubber fluid circulation
π Ahmedabad
Quality 4/5
Delivery 4/5
J
Jatin Bose
β Verified
23 Aug 2026 β’ 1β6 months β’ π Visakhapatnam
β
β
β
β
β
O-RING
βΉ 80
View β
Warning. Flimsy Material
Cheap fit loose.
π Chemical Processing
βοΈ Tanker offloading
π Visakhapatnam
Quality 4/5
Delivery 4/5
R
Rohan Sen
β Verified
22 Aug 2026 β’ 6β12 months β’ π Kolkata
β
β
β
β
β
MANIFOLD
βΉ 11,382
View β
Pricing & Value. Expensive Shipping
High shipping costs.
π Chemical Processing
βοΈ Tank circulation
π Kolkata
Quality 4/5
Delivery 4/5
D
Diya Bajaj
β Verified
20 Aug 2026 β’ Less than 1 month β’ π Lucknow
β
β
β
β
β
M10B NBR PHE Gasket
βΉ 828
View β
Unavailable Cert Documents
Support failed to deliver material cert papers for audit.
π Marine & Shipyard
βοΈ Glycol Loop Barriers
π Lucknow
Quality 4/5
Delivery 4/5
R
Rahul Sen
β Verified
20 Aug 2026 β’ Over 1 year β’ π Pune
β
β
β
β
β
O-RING
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Mining and Construction
βοΈ Hydraulic oil scavenging
π Pune
Quality 4/5
Delivery 4/5
R
Riya Banerjee
β Verified
20 Aug 2026 β’ 6β12 months β’ π Jaipur
β
β
β
β
β
O-RING BUNA-N EXB
βΉ 256
View β
Overpriced Service
The cost is far too premium compared to alternatives.
π Water and Wastewater Treatment
βοΈ Leachate extraction
π Jaipur
Quality 4/5
Delivery 4/5
A
Arun Bansal
β Verified
20 Aug 2026 β’ 1β6 months β’ π Bhopal
β
β
β
β
β
DIAPHRAGM SHAFT SEAL -3" (B720-004-360)
βΉ 546
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Paint, Ink, and Coatings
βοΈ Latex base transfer
π Bhopal
Quality 4/5
Delivery 4/5