A
Arun Goel
β Verified
05 Sep 2026 β’ Less than 1 month β’ π Bhopal
β
β
β
β
β
O' RING-EXB (G245)
βΉ 384
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Paint, Ink, and Coatings
βοΈ Varnish transfer
π Bhopal
Quality 4/5
Delivery 4/5
N
Neha Khanna
β Verified
05 Sep 2026 β’ 1β6 months β’ π Ahmedabad
β
β
β
β
β
GASKET AIR INLET (B360.104.360)
βΉ 1,002
View β
Unresponsive Support
Left on hold without receiving any clear resolution.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Ahmedabad
Quality 4/5
Delivery 4/5
R
Reyansh Banerjee
β Verified
05 Sep 2026 β’ 1β6 months β’ π Bhopal
β
β
β
β
β
SPACER-EXB (B770.065.175)
βΉ 244
View β
Unexpected Charges
Additional hidden fees were tacked onto the final bill.
π Food and Beverage
βοΈ Tomato paste unloading
π Bhopal
Quality 4/5
Delivery 4/5
P
Prem Gaikwad
β Verified
05 Sep 2026 β’ Over 1 year β’ π Ranchi
β
β
β
β
β
DIAPHEAGM SHAFT SEAL (25-072)
βΉ 1,895
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Scrubber fluid circulation
π Ranchi
Quality 4/5
Delivery 4/5
R
Ritesh Dubey
β Verified
05 Sep 2026 β’ Over 1 year β’ π Surat
β
β
β
β
β
VALVE BALL SS - 1" (1H-087)
βΉ 1,282
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Paint, Ink, and Coatings
βοΈ Color kitchens washdown
π Surat
Quality 4/5
Delivery 4/5
A
Arpit Tiwari
β Verified
05 Sep 2026 β’ Over 1 year β’ π Uttar Pradesh
β
β
β
β
β
VALVE BLOCK (40-264)
βΉ 5,200
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Paint, Ink, and Coatings
βοΈ Primer coat feeding
π Uttar Pradesh
Quality 4/5
Delivery 4/5
M
Mayank Khanna
β Verified
05 Sep 2026 β’ Less than 1 month β’ π Visakhapatnam
β
β
β
β
β
VALVE CARRIER
View β
Incomplete Package
Several vital components were missing from the order box.
π Water and Wastewater Treatment
βοΈ Filter backwash evacuation
π Visakhapatnam
Quality 4/5
Delivery 4/5
K
Kriti Naik
β Verified
05 Sep 2026 β’ Over 1 year β’ π Nagpur
β
β
β
β
β
AIR SIDE KIT- 1/2" (ASK 1501)
βΉ 4,702
View β
Damaged Arrival
Packaging arrived crushed and internal contents were compromised.
π Mining and Construction
βοΈ Fly ash slurry
π Nagpur
Quality 4/5
Delivery 4/5
H
Himanshu Gupta
β Verified
05 Sep 2026 β’ Less than 1 month β’ π Kota
β
β
β
β
β
SEALING INLET /OUTLET -PTFE/FPM
βΉ 3,993
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Mining and Construction
βοΈ Fly ash slurry
π Kota
Quality 4/5
Delivery 4/5
A
Ananya Agarwal
β Verified
05 Sep 2026 β’ Less than 1 month β’ π Lucknow
β
β
β
β
β
DISCHARGE MANIFOLD - EXB
βΉ 28,995
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Chemical Processing
βοΈ Neutralization feeding
π Lucknow
Quality 4/5
Delivery 4/5